DQRID : D991109.21
Start DateStart TimeEnd DateEnd Time
10/05/1999100510/05/19991035
more
Subject:
SGP/SMOS/E11 - E11 SMOS lowered to surface to install counterweights
DataStreams:sgp1smosE11.00, sgp30smosE11.a1, sgp1smosE11.a0, sgpsmosE11.01
Description:
The E11 SMOS was lowered to the surface on 5 OCT 1999 between 1005 and 1035 GMT 
while counterweights were installed.  All temperature and humidity data are questionable
during this period.
Suggestions: 
Temperature and humidity are questionable during this period.
Measurements:sgp1smosE11.00:
  • (Raw data stream - documentation not supported)
more
sgp1smosE11.a0:
  • Environmental Temperature (hybrid-b grid)(temp)
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Relative Humidity (hybrid-b grid)(rh)
more
sgp30smosE11.a1:
  • Standard Deviation of Air Temperature(sd_temp)
  • Environmental Temperature (hybrid-b grid)(temp)
  • Standard Deviation of Relative Humidity(sd_rh)
  • Standard deviation of vapor pressure(sd_vap_pres)
  • Relative Humidity (hybrid-b grid)(rh)
  • Vapor Pressure (kiloPascals)(vap_pres)
more
sgpsmosE11.01:
  • (Raw data stream - documentation not supported)
more

Close this window