Data Quality Reports for Session: 102433 User: perez Completed: 11/01/2006


TABLE OF CONTENTS

DQR IDSubjectData Streams Affected
D060403.4SGP/SIRS/E20 - Instrument noise problemsgpsirsE20.00, sgpsirsE20.b1, sgpsirs20sE20.a0
D060630.26SGP/SIRS/E20 - Reprocess: Longwave Calibration errorsgpsirsE20.b1


DQRID : D060403.4
Start DateStart TimeEnd DateEnd Time
08/20/2005193004/12/20062040
Subject:
SGP/SIRS/E20 - Instrument noise problem
DataStreams:sgpsirsE20.00, sgpsirsE20.b1, sgpsirs20sE20.a0
Description:
Afer recovery from lightening strike the upwelling longwave SIRS Eppley PIR (UIR) has had 
noise on both dome and case thermistor measurements.  On 4/12/2006 techs replaced 
defective j-panel at base of tower.
Measurements:sgpsirsE20.b1:
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer,
    Minima(up_long_hemisp_min)
  • Upwelling Longwave Hemispheric Net Infrared(up_long_netir)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer,
    Maxima(up_long_hemisp_max)
  • Instantaneous Upwelling Pyrgeometer Case Thermistor Temperature, Pyrgeometer(inst_up_long_case_temp)
  • Instantaneous Upwelling Pyrgeometer Dome Thermistor Temperature, Pyrgeometer(inst_up_long_dome_temp)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer,
    Standard Deviation(up_long_hemisp_std)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer(up_long_hemisp)

sgpsirs20sE20.a0:
  • Instantaneous Upwelling Pyrgeometer Thermopile Voltage, Pyrgeometer(inst_up_long_hemisp_tp)
  • Instantaneous Upwelling Pyrgeometer Dome Thermistor Resistance, Pyrgeometer(inst_up_long_dome_resist)
  • Instantaneous Upwelling Pyrgeometer Case Thermistor Resistance, Pyrgeometer(inst_up_long_case_resist)

sgpsirsE20.00:
  • Raw data stream - documentation not supported(Raw data stream - documentation not supported)


Back To Table of Contents

DQRID : D060630.26
Start DateStart TimeEnd DateEnd Time
07/23/2003210002/15/20062030
Subject:
SGP/SIRS/E20 - Reprocess: Longwave Calibration error
DataStreams:sgpsirsE20.b1
Description:
Modified pyrgeometer calibration procedures were implemented beginning in December 2003.  
These modified procedures introduced a calibration bias in the longwave data.  The 
previous procedures were re-implemented at all sites between December 2005 and February 2006 to 
restore proper calibrations.                                                             
                The data collected while the incorrect procedures were in place are 
being reprocessing to remove the calibration bias.  Note, this also affected standard 
deviation, maximum and minimum data fields.
Measurements:sgpsirsE20.b1:
  • Upwelling Longwave Hemispheric Net Infrared(up_long_netir)
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer(down_long_hemisp_shaded)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer(up_long_hemisp)
  • Downwelling Longwave Hemispheric Net Infrared(down_long_netir)


Back To Table of Contents



END OF DATA