Description: | BarrowC1, Gndrad. On Aug 11th the PSP-US was changed out and the Campbell program was
changed to reflect this. However, an old program that uses the 4 coefficient PIR cal factors
was used. The PIR-UIR was not changed out, however, the logger program coeffs reverted
back to the 4 Coeffcients. The Eppley PIR-UIR coefficients for this S/N 30168F3 are :
K0=0.0, K1(aka k)=.25253, K2= 1.0, K3=-4, Kr=0.0. |
Measurements: | nsagndradC1.00: - Raw data stream - documentation not supported(Raw data stream - documentation not supported)
nsagndrad20sC1.a0: - Instantaneous Upwelling Pyrgeometer Case Thermistor Resistance Pyrgeometer(inst_up_long_case_resist)
- Instantaneous Upwelling Pygeometer Thermopile Voltage(inst_up_long_hemisp_tp)
- Instantaneous Upwelling Pyrgeometer Dome Thermistor Resistance Pyrgeometer(inst_up_long_dome_resist)
nsagndrad60sC1.b1: - Upwelling (10 meter) Longwave Hemispheric Irradiance, Pyrgeometer, Standard
Deviation(up_long_hemisp_std) - NET mean(net_mean)
- NET standard deviation(net_sd)
- PIR1 unshaded standard deviation(pir1_sd)
- PIR1 unshaded mean(pir1_mean)
- Net Radiation, Standard Deviation(net_std)
- Upwelling (10 meter) Longwave Hemispheric Irradiance, Pyrgeometer, Minima(up_long_hemisp_min)
- PIR1 unshaded minimum(pir1_min)
- Net Radiation, Minima(net_min)
- PIR1 unshaded maximum(pir1_max)
- Upwelling (10 meter) Longwave Hemispheric Irradiance, Pyrgeometer, Maxima(up_long_hemisp_max)
- Upwelling (10 meter) Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
- Net Radiation, Maxima(net_max)
nsagndrad20sC1.a1: - Instantaneous Upwelling Pyrgeometer Dome Thermistor Resistance Pyrgeometer(inst_up_long_dome_resist)
- Instantaneous Upwelling Pyrgeometer Case Thermistor Resistance Pyrgeometer(inst_up_long_case_resist)
- Instantaneous Upwelling Pygeometer Thermopile Voltage(inst_up_long_hemisp_tp)
- Instantaneous PIR1 uncorrected irradiance(pir1_voltage)
- Instantaneous PIR1 dome thermistor(pir1_dome_therm)
- Instantaneous PIR1 case thermistor(pir1_case_therm)
|