DQR ID | Subject | Data Streams Affected |
---|---|---|
D031216.1 | NSA/GNDRAD/C1 - IRT cable failure | nsagndrad60sC1.b1 |
D060630.39 | NSA/GNDRAD/C1 - Reprocess: Longwave Calibration error | nsagndrad60sC1.b1 |
D080919.1 | NSA/GNDRAD/C1 - Net radiometer removed | nsagndrad60sC1.a1, nsagndrad60sC1.b1 |
D090209.2 | NSA/GNDRAD/C1 - Reprocess: IRT insufficiently heated | nsagndrad60sC1.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
05/27/2003 | 1400 | 09/11/2003 | 1906 |
Subject: | NSA/GNDRAD/C1 - IRT cable failure |
DataStreams: | nsagndrad60sC1.b1 |
Description: | The IRT signal became very noisy and the problem was traced to the cable (after the instrument was returned to the vendor for diagnosis). The problem started occurring when ice surrounding the cable began to melt. The cable was repaired and the instrument reinstalled. |
Measurements: | nsagndrad60sC1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
11/04/2004 | 1600 | 12/21/2005 | 1855 |
Subject: | NSA/GNDRAD/C1 - Reprocess: Longwave Calibration error |
DataStreams: | nsagndrad60sC1.b1 |
Description: | Modified pyrgeometer calibration procedures were implemented beginning in December 2003. These modified procedures introduced a calibration bias in the longwave data. The previous procedures were re-implemented at all sites between December 2005 and February 2006 to restore proper calibrations. The data collected while the incorrect procedures were in place are being reprocessing to remove the calibration bias. Note, this also affected standard deviation, maximum and minimum data fields. |
Measurements: | nsagndrad60sC1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
02/03/2000 | 0000 | 03/03/2003 | 2359 |
Subject: | NSA/GNDRAD/C1 - Net radiometer removed |
DataStreams: | nsagndrad60sC1.a1, nsagndrad60sC1.b1 |
Description: | The net radiometer was removed from the NSA.C1 GNDRAD instrument suite on Feb 3, 2000. Net rad variables were filled with garbage data until Sept 23, 2000 and with missing values (-9999) until 20041103. The net rad variables were removed from the netcdf files after 20041103. A reprocessing task (RID-526) has been submitted to the queue to address the need to add metadata to the NSA.C1 GNDRAD netcdf files documenting the missing data as well as to move toward a consistent datastream format throughout time. |
Measurements: | nsagndrad60sC1.b1:
nsagndrad60sC1.a1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
03/01/1999 | 0000 | 12/22/2000 | 2020 |
Subject: | NSA/GNDRAD/C1 - Reprocess: IRT insufficiently heated |
DataStreams: | nsagndrad60sC1.b1 |
Description: | IRT had insufficient heating to maintain an internal reference temperature above 0 degrees C. Measurements of surface temperature were over-estimated when instrument was below freezing. Data will be reprocessed, but users can correct data using the following correction factor: If T_reference < -5?C, then IRT_corrected = (IRT_original - 32.993K)/0.87238 where T_reference can be estimated with the ambient temperature (e.g. inst_up_long_hemisp_dome_temp or inst_up_long_dome_temp) |
Measurements: | nsagndrad60sC1.b1:
|