DQR ID | Subject | Data Streams Affected |
---|---|---|
D120913.1 | PVC/SKYRAD/M1 - Intake Fan Failure | pvcskyrad20sM1.a0, pvcskyrad60sM1.b1 |
D121005.1 | PVC/GNDRAD/M1 - Reprocessed: Incorrect calibration | pvcgndrad20sM1.a0, pvcgndrad60sM1.b1 |
D121008.1 | PVC/SKYRAD/M1 - Reprocessed: Incorrect calibration coefficients | pvcskyrad20sM1.a0, pvcskyrad60sM1.b1 |
D121018.10 | PVC/SKYRAD/M1 - Reprocess: Incorrect IRT Configuration | pvcskyrad60sM1.b1 |
D121217.8 | PVC/SKYRAD/M1 - IRT disconnected | pvcskyrad60sM1.b1 |
D121218.4 | PVC/GNDRAD/M1 - IRT failure | pvcgndrad20sM1.a0, pvcgndrad60sM1.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
06/25/2012 | 0000 | 08/28/2012 | 2045 |
Subject: | PVC/SKYRAD/M1 - Intake Fan Failure |
DataStreams: | pvcskyrad20sM1.a0, pvcskyrad60sM1.b1 |
Description: | PSP (down_short_hemisp) ventilator fan failed from start of PVC deployment. Site ops repaired/replaced on 8/28. Instrument data are not recoverable. The down_short_hemisp data are not recoverable but can be re-constructed using the short_direct_normal and down_short_diffuse_hemispheric measurements and the following formula: Global = Direct * cos(zenith angle) + Diffuse |
Measurements: | pvcskyrad20sM1.a0:
pvcskyrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
06/25/2012 | 0000 | 10/04/2012 | 2017 |
Subject: | PVC/GNDRAD/M1 - Reprocessed: Incorrect calibration |
DataStreams: | pvcgndrad20sM1.a0, pvcgndrad60sM1.b1 |
Description: | Incorrect program used in Gndrad since PVC deployment period began. The Gndrad program was corrected 10/04/2012 approx 20:17GMT. Reprocessing will be required of the upwelling PSP (up_short_hemsip). This will require applying the following corrections for the time range specified. Serial number: serial number(original) = 30938 serial number(corrected) = 37297 Data: up_short_hemip(corrected) = up_short_hemisp(original)*(113.25(new cal)/129.42(old cal)) Reprocessing completed 20121119. |
Measurements: | pvcgndrad60sM1.b1:
pvcgndrad20sM1.a0:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
06/25/2012 | 0000 | 09/05/2012 | 2000 |
Subject: | PVC/SKYRAD/M1 - Reprocessed: Incorrect calibration coefficients |
DataStreams: | pvcskyrad20sM1.a0, pvcskyrad60sM1.b1 |
Description: | Incorrect programs were used in Skyrad since PVC deployment period began. The Skyrad program was corrected 09/05/2012 approx 20:00GMT. Reprocessing will be required of all instruments at this station except the IRT. This will require applying the following corrections for the time range specified. Serial numbers(incorrectly applied): PIR1-DIR: 34306 PIR2-DIR: 34303 Diffuse PSP: 34284 NIP: 34097 PSP-DS: 34293 Serial numbers(correct): PIR1-DIR: 34303 PIR2-DIR: 34306 Diffuse PSP: 35751 NIP: 37285 PSP-DS: 37302 Data: Longwave requires reprocessing using the 20second datastream and applying the following k1 coefficients (note: the longwave instruments were swapped according to datalogger). down_long_hemisp1 (old cal) = 0.23041 down_long_hemisp1 (corr cal) = 0.24750 down_long_hemisp2 (old cal) = 0.24750 down_long_hemisp2 (corr cal) = 0.23041 Shortwave only requires application of the following corrections to 1min and 20 second data. down_short_diffuse_hemisp(corr) = down_short_diffuse_hemisp(old value)*(104.45(corr cal)/120.91(incorr cal)) short_direct_normal(corr) = short_direct_normal(old value)*(117.25(new cal)/124.97(incorr cal)) up_short_hemip(corr) = up_short_hemip(old value)*(119.21(new cal)/108.48(incorr cal)) Contact radiometer mentor with any comments/questions Reprocessing completed 20121217 |
Measurements: | pvcskyrad20sM1.a0:
pvcskyrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
06/29/2012 | 2240 | 10/18/2012 | 1259 |
Subject: | PVC/SKYRAD/M1 - Reprocess: Incorrect IRT Configuration |
DataStreams: | pvcskyrad60sM1.b1 |
Description: | The SKYRAD IRT was installed temporarily (waiting for the new enclosure) in a vertical orientation, without the use of the gold mirror. When irt_comm was started, the emissivity parameter in the startup file was not changed to 1.000 compensate for the absence of the mirror, resulting in a positive bias of about 5 K. These data may be corrected by adjusting the radiance values for the difference in emmissivity. |
Measurements: | pvcskyrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
07/11/2012 | 1200 | 07/15/2012 | 1135 |
Subject: | PVC/SKYRAD/M1 - IRT disconnected |
DataStreams: | pvcskyrad60sM1.b1 |
Description: | The IRT was disconnected to diagnose PIR signal noise. |
Measurements: | pvcskyrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
06/26/2012 | 0000 | 12/11/2012 | 1556 |
Subject: | PVC/GNDRAD/M1 - IRT failure |
DataStreams: | pvcgndrad20sM1.a0, pvcgndrad60sM1.b1 |
Description: | The IRT failed but continued producing a misleading analog signal. The ground surface temperature measurements were unrepresentative of the actual temperature. |
Measurements: | pvcgndrad60sM1.b1:
pvcgndrad20sM1.a0:
|