D170523.7 | ENA/AOS/C1 - Maintenance and calibration | enaaoscapsC1.a1 | Suspect |
D160909.21 | ENA/AOS/C1 -Internal pump failure | enaaoscapsC1.a1 | Incorrect |
D160329.1 | ENA/CAPS-PMEX/C1 - Dirty optics | enaaoscapsC1.a1 | Suspect |
D151112.5 | ENA/CAPS-PMEX/CPC/NEPHELOMETER/PSAP/C1 - Impactor not switching | enaaoscapsC1.a1 | Note |
D151106.2 | ENA/NEPHELOMETER/PSAP/CAPS-PMEX/NEPHELOMETER/PSAP/C1 - Impactor stuck at 10 microns | enaaoscapsC1.a1 | Note |
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
2017-05-23 | 09:00:00 | 2017-05-30 | 12:00:00 | Suspect |
Subject: | ENA/AOS/C1 - Maintenance and calibration |
---|---|
Affected Datastreams: | enaaoscapsC1.a1 |
Description | Mentors are on site performing maintenance and calibration of AOS instruments. Data are suspect during this work. |
Measurements |
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
2016-09-08 | 00:24:00 | 2016-11-24 | 17:34:00 | Incorrect |
Subject: | ENA/AOS/C1 -Internal pump failure |
---|---|
Affected Datastreams: | enaaoscapsC1.a1 |
Description | The internal pump of the CAPS failed. Vendor (Aerodyne) sent a replacement pump. The replacement pump was installed by onsite tech on 11/24/2016 at 17:34. |
Measurements |
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
2014-09-11 | 11:00:00 | 2014-10-08 | 12:47:00 | Suspect |
Subject: | ENA/CAPS-PMEX/C1 - Dirty optics |
---|---|
Affected Datastreams: | enaaoscapsC1.a1 |
Description | During the time frame in question, there were several issues with the CAPS, including (i) very dirty optics - due to a tear in the purge lines that are used to keep the mirrors clean (ii) a significant reduction in S/N due to the dirty optics, (iii) which caused the raw loss to go way up and the noise level in grounding issue that required a new power supply. The latter issue necessitated removing the CAPS from the AOS to conduct several tests in the support building. So in summary: Negative extinction is unrealistic and was due to very dirty mirrors and control software issues. Flatlining is due to the CAPS not being connected up because of troubleshooting. Keep in mind that deployment of the CAPS at ENA was the first long term deployment of this instrument. Following this 'birthing' period, the unit has run exceptionally well. |
Measurements |
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
2015-03-27 | 10:52:00 | 2015-03-30 | 18:00:00 | Note |
Subject: | ENA/CAPS-PMEX/CPC/NEPHELOMETER/PSAP/C1 - Impactor not switching |
---|---|
Affected Datastreams: | enaaoscapsC1.a1 |
Description | AOS tech was working in the AOS and accidentally unplugged the impactor power supply. This left the impactor in the 10 micron state. |
Measurements |
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
2015-11-02 | 16:07:31 | 2015-11-03 | 14:09:53 | Note |
Subject: | ENA/NEPHELOMETER/PSAP/CAPS-PMEX/NEPHELOMETER/PSAP/C1 - Impactor stuck at 10 microns |
---|---|
Affected Datastreams: | enaaoscapsC1.a1 |
Description | Upstream impactor was stuck at the 10 micron position. Data for the period is valid but representative of an effective 10 micrometer impactor setting only. |